2-bedroom apartments 46 m² The Title Coralina, Kamala
Main Characteristics
Apartment Description
The 1 Bedroom Plus apartments at The Title Coralina Kamala project are designed for those who need not only one bedroom, but also a second room: for a home office, children's bedroom or guest room. Resort-style modern luxury accommodation just 400 metres from Kamala Beach, where buying apartments with two separate rooms at the price of a one-bedroom format is rare.
What the layout offers:
bedroom with double bed and built-in wardrobe
second room for office, children's or guest use
living area with sofa and dining table for four
kitchen with hob and sink, space for refrigerator
bathroom with shower, technical niche for washing machine
terrace along the façade with curved railings
Panoramic glazing and light finishes visually expand the space; fitted furniture and appliances are already included in the price.
Two-room formats leave the Kamala market first: they work equally well for both short-term and long-term rental. The Title Coralina Kamala strengthens this scenario with infrastructure across 22 zones and professional management company.
Infrastructure and ServicesInfrastructure and Services
Location Description
Kamala is among the three most sought-after beach neighbourhoods in Phuket: a quiet bay with a gentle water entry, well-maintained promenade and five-star hotel-level service. It makes sense to purchase property in Kamala both for personal residence and for rental, as this neighbourhood is favoured by Europeans for its peaceful atmosphere and comfort level.
Nearby:
Kamala Beach, 400 m walk
Wattanapat Hospital, 450 m
Phuket FantaSea show park, 500 m
Big C supermarket, 1 km
Tops, 1.1 km
Cafe del Mar beach club, 1.2 km
Villa Market, 1.2 km
InterContinental Hotel, 1.4 km
Patong, 15 minutes by car
Phuket Airport, 30 minutes
Walking distance to beach, medical services and shops maintains rental occupancy year-round, while the neighbourhood's calm character preserves comfort for permanent residence.
Property Advantages
Second separate bedroom
The study, children's room or guest room closes with a door and does not reduce the living room's floor area. For remote work and families with a child, this layout replaces a two-bedroom apartment at a lower budget.
Format for two rental scenarios
During high season, the apartment is let on a short-term basis as a family unit; during low season it operates on a long-term contract with an expat. Minimum vacancy — maximum profit.
Property in full readiness
The apartment can be let immediately upon handover of keys, without investment in furnishings.
Additional
Reservation: 100,000 THB
Contract payment: 25% (within 30 days)
2nd payment: 25% (after 7 months)
3rd payment: 25% (after 7 months)
Final payment: 25% (upon completion of construction)
1. Leasehold registration (lease up to 90 years) - 1.1% of purchase price
2. Freehold registration (100% ownership) - 1.1% + additional payment of 300,000 ฿
3. Building maintenance fund - 850 ฿ per m² one-time payment
4. Service charge (common area fee) - 85 ฿ per m², monthly, billed annually
5. Utility meter installation - 12,000 ฿
Fitted furniture and appliances are included in the purchase price.
Additional
Reservation: 100,000 THB
Contract payment: 25% (within 30 days)
2nd payment: 25% (after 7 months)
3rd payment: 25% (after 7 months)
Final payment: 25% (upon completion of construction)
1. Leasehold registration (lease up to 90 years) - 1.1% of purchase price
2. Freehold registration (100% ownership) - 1.1% + additional payment of 300,000 ฿
3. Building maintenance fund - 850 ฿ per m² one-time payment
4. Service charge (common area fee) - 85 ฿ per m², monthly, billed annually
5. Utility meter installation - 12,000 ฿
Fitted furniture and appliances are included in the purchase price.
Project Gallery
About developer
Rhom Bho Property Public Company Limited is a developer operating in the Phuket property market and building residential projects under the brand The Title. The company was established to create quality residential environments on the island and develop Phuket as a strong destination for living and investment. Over its years of operation, the company has built a substantial portfolio of projects and developed a systematic approach to development, grounded in the selection of strong locations, construction quality, contemporary design, and client service.
Key metrics:
19 projects in Phuket
5 completed projects
2 projects ready for occupancy
12 projects under construction
15 years of experience in the property sector in Phuket
The company was founded by a group of like-minded individuals under the leadership of Mr Dendanai Hutajuta and drew on extensive property sector experience from the outset. Consistent development and successful project delivery established the company as a notable player in the island market.
A significant subsequent milestone was the transformation into a public structure. In 2016, Rhom Bho Property Co., Ltd. was restructured as Rhom Bho Property Public Company Limited. The developer describes this step as strategic: it provided access to capital markets, created further opportunities for growth, and formed the foundation for sustained future development.
The company also emphasises the strengthening of its position through integration into Asset Wise Public Company Limited, one of the larger developers. Additionally, Rhom Bho Property Public Company Limited began collaborating with 39 Estate Co., Ltd., a subsidiary of Asset Wise. According to the developer's assessment, this partnership has broadened development capabilities and enhanced the realisation of Phuket's property market potential.
Recommended
1-bedroom apartment 34 m² Citygate, Kamala
One-bedroom apartment 31 m² The Title Coralina, Kamala